Chess NT were engaged to bring an existing switch board up to current standards. This included a new switch board enclosure and RCD protection for all circuits. Through the installation process, it was discovered to have undersized main cables run from the meter board to the switch board. This was later rectified as a variation which included a new service pole, a new metering enclosure and sub mains from the metering enclosure to the switch board.